Preparing area for excavation
Antiquated Orangeberg pipe failure
Excavation begins
Installation of collection Basins
Installation of collection Basins
Filter fabric installed on perforated pipe
Perforated pipe with filter fabric placed in trench
Weed block installed and backfilled w/clean gravel
Rain water collection system successfully installed and project complete
Leaking foundation crack
Drilling holes for injection ports
Ports installed, ready for injection
Injecting crack with urethane grout
Urethane infiltration of crack complete
Unfinished basement with chronic water and moisture issue.
Water infiltration has compromised block and mortar joints.
Our certified installer removes a small section of the floor in the impacted area.
Open trench ready for drainage tracks to be inserted.
Small weepholes are drilled beneath the floor slab to release hydrostatic pressure (block wall only).
Advanced water control drainage system consisting of ridged gussets and rubber seals is inserted into the removed section of the floor.
Cross-section of drainage system backfilled with clean gravel.
System installed ready for repouring of concrete.
Removed section of the concrete floor is repoured to original thickness, ensuring its structural integrity.
Concrete is cured and drainage system is installed. Basement floor is washed down.
Basement is finished, furnished, and the project is complete.