Commercial emergency, flooded freight elevator pit
Freight Elevator – back entrance to commercial building
Water penetration through ground into pit foundation (est. rate of water infiltration 0.55mm gal/day)
Removing water through 3 submersible pumps
Acrilimyde injected into foundation walls
Original water level
Injections finished, structure deemed dry
Elevator functioning properly, project complete